What tools are needed to make an installation?

Read below which tools to bring for an installation.

Before the installation, it is important to prepare the tools that could be necessary to use on-site.

  • Manual Torx T10 screwdriver, for Sani Sensors 2

  • Dymo writer, with an extra cartridge (to label e.g. pump holders)

  • Smartphone with the Sani Backoffice app installed

  • Alcohol cleaning wipes, to wipe the surfaces before gluing sensors

  • Sani Nudge T-shirts, to identify as technicians

  • Tape measure to determine 180 cm height for bed sensor placement